NEM 3.0 explained: what changed for California solar owners

Net Billing Tariff, CPUC Decision D.22-12-056, effective 2023-04-15. Data as of 2026-10-18.

In one paragraph: NEM 3.0 replaced near-retail export credit with hourly avoided-cost values. Every kWh you consume at home still offsets a full retail purchase; every kWh you export earns far less. That single asymmetry is why storage moved from optional to near-essential for new solar customers.

Three key changes

  1. How exports are valued — hourly Avoided Cost Calculator values instead of the retail rate.
  2. When they are valued — midday exports, when the grid is saturated with solar, are worth the least; hot summer evenings are worth the most.
  3. The winning strategy — self-consume and store, rather than oversize and export.

NEM 2.0 vs NEM 3.0

Comparison applies to new interconnections; existing NEM 2.0 customers keep their legacy tariff for their term.
NEM 2.0 (grandfathered)NEM 3.0 (new)
Export compensationNear retailAvoided cost ($0.03–$0.21 per kWh average)
ValuationMostly flatHundreds of hourly prices
Best strategyOversize panels, bank creditsSelf-consume + battery
BatteryOptionalEffectively essential
Term guaranteed20 years9 years

Southern California Edison TOU-D-PRIME time-of-use rates

TOU-D-PRIME representative rates, Southern California Edison, as of 2026-10-18
PeriodRateWindow
Summer on-peak (weekdays)$0.6116:00-21:00, June–September
Summer mid-peak (weekends)$0.3916:00-21:00 weekends
Winter mid-peak$0.4516:00-21:00, October–May
Off-peak$0.26–$0.30All other hours (summer / winter)
Super off-peak$0.248 a.m.–4 p.m., October–May
Base services charge$0.79/dayFixed cost — not modelled in payback

Why a battery stopped being optional

$0.61Summer on-peak import, 16:00-21:00 weekdays, June-September weekdays — the highest-rate window on TOU-D-PRIME
$0.06What the same exported kWh earns on average (avoided cost)

A kWh you store and use yourself avoids a purchase at the peak rate. A kWh you export earns the avoided-cost value. The spread between those two numbers — not the subsidy — is what pays for a battery in 2026.

Policy status that affects the math

Rendered from the site's incentives dataset; verify current status before relying on it.
ProgramStatusDetail
Residential Clean Energy Credit (25D)terminatedHomeowner-owned systems placed in service on or before 2025-12-31
Clean Electricity Investment Credit (48E)active for third party30% credit · Third-party-owned (lease/PPA) systems; credit belongs to the system owner, not the homeowner
SGIP General Marketclosed$0.15/Wh · General market residential · closed 2025-12-31
SGIP Equityclosed$0.85/Wh · Income-qualified · closed 2025-12-31
SGIP Equity Resiliencyclosed$1.00/Wh · Income-qualified, high fire threat / PSPS area · closed 2025-12-31
SGIP RSSE (AB 209)waitlist$1.10/Wh · Income-qualified only; waitlisted in most territories · deadline 2028-06-30

→ Run your own numbers in the calculator · Sources and method